Patong and Kamala are mostly back to normal after the rain, but Nanai Road still closes by day
After the October 25–26 rains, roads in Patong and Kamala quickly returned to normal, but one Patong stretch is still closed during the day for surface restoration.
What changed by the morning of October 27
On Phuket’s west side, floodwater has receded and traffic in Kamala is back to normal. Patong has also largely reopened, but Nanai Road remains temporarily closed between Banzaan Market Intersection and Pearl Roundabout.
The closure runs from 10:00 a.m. to 4:00 p.m., right in the hours when many people are moving between hotels, markets, the beach, and the airport.
Where the delay remains
This is not a full traffic shutdown. It is a road-surface restoration job after the heavy rain. Most major roads in Patong and Kamala are open again, so the island’s usual flow is returning quickly.
Still, anyone leaving Patong should check the route in advance: even a short detour can add 10–20 minutes at busy times.
If you are heading to the airport
For Phuket International Airport, it is wise to leave extra time, especially if your route passes through Patong, Kamala, or the west coast after rain. Local traffic can slow down because of residual rain, road works, and slower moving vehicles.
Simple rule: if your flight matters, leave earlier than usual and do not leave the trip to the last minute.
Key points for today
- Patong and Kamala are mostly back to normal.
- Nanai Road is still closed by day on one stretch.
- Closure window: 10:00 a.m.–4:00 p.m., October 27.
- Allow extra time for airport-bound trips.






